Maheshwari Mining Pvt Ltd

Projects

Home / Projects

Projects

Mining On Going Projects (FY 2022-23)

S No. Client State Work Ore
1 Hindustan Copper Limited Jharkhand Mine Development, Operation and Maintenance of Surda Mine, Jharkhand India Copper
2 Hindustan Copper Limited M.P Underground Mine Developmental work at Malanjkhand Copper Project Copper
3 Hindustan Zinc Limited Rajasthan Mine Development & ore production at Baroi Mines Zinc
4 Tata Steel Ltd Jharkhand Site Scientific study along with Extraction of XI seam of Jamadoba Colliery using suitable blastless technology along Coal
5 Manganese Ore India Limited MP Sinking, lining and equipping of shaft with supply, installation and commissioning of 550 KW winder at Ukwa Mine. Manganese
6 Hindustan Copper Limited Rajasthan Supply, Operation & Maintenance of undeground equipment at HCL Kolihan Mine of Khetri Complex Copper
7 Hindustan Copper limited Jharkhand Reopening, Operation & expansion of closed Kendadih copper mine, ICC Copper
8a Indian Metals & Ferro Alloys Limited Odisha Underground Mine Development and production at Mahagiri Chromite Mines Chromite
8b Indian Metals & Ferro Alloys Limited Odisha Hiring of Machinery for Drilling, Mucking &Tramming of Ores at Mahagiri chromite Mines Chromite
8c Indian Metals & Ferro Alloys Limited Odisha BOO Contract for Installation, Operation & Maintenance of Plant & equipment for Backfilling of stopes at Mahagiri Mines Chromite
9 Eastern Coal Field Limited Raniganj Area Conversion of Steam to Electric Winders Coal

Exploration On Going Projects (FY 2022-23)

S No. CLIENT DETAILS MINERALS QUANTUM IN MTR. DEPTH RANGE (IN MTR.)
1 Tata Steel Limited Iron, coal 90,000m <1100m
2 Central Mine Planning & Designing Institute Limited Coal 3,50,000m <650m
3 Atomic Mineral Directorate for Exploration & Research Niobium (Nb), Tantalum (Ta), Lithium (Li), Beryllium (Be), Cesium 2,50,000m <600m
4 Geological Survey of India Geo-engineering – Geotechnical Projects, natural hazard mitigation studies, Glaciology, etc 68,000m <1300m
5 Hindustan Zinc Limited Zinc, lead, silver 2,00,000m <1400m
6 Mineral Exploration Corporation Ltd. Coal, Lignite, Bauxite, Copper, Gold, Lead- Zinc, Iron Ore, Limestone, Manganese, Magnesite, Chromite 56,000m <1100m
7 The Singareni Collieries Co. Ltd. Coal 16,450m <500m
8 Chhattisgarh Mineral Development Corp. Bauxite, Limestone, Dolomite and Corundum, Coal & Iron 32,000m <100m
9 Orissa Mining Corporation Chrome, Iron, and manganese 70,000m <150m
10 ONGC Limited Uranium and Helium 79,050m <800m
11 Madhyapara Project (Bangladesh) Granite 4500m <450m
12 Director of Geology, Odisha Iron ore, Manganese, Chromite, Bauxite, Base metal, Limestone, graphite, coal, Gemstone, Dolomite, China Clay, Pyrophyllite, Decorative Stones, Quartz and Quartzite 30,000m <150m
13 Eastern Coalfields Limited Coal 1000m
14 Jindal Stainless Limited Iron, Chromite 5000m <600m
15 Moil Ltd. Manganese 22,400m <400m
16 JSW Group Coal, Iron 10461m < 1250 m
17 Chandi Steel Limited Coal 16526m < 650 m
18 Andal East Coal Company Coal 16235m < 850 m
19 Great Eastern Energy Coal 5951m < 1200 m
20 Maharashtra State Power Coal 12021m < 350 m
21 Maharashtra State Mineral Coal 5605m < 300 m
22 Rio Tinto Exploration Coal 2750m < 450 m
23 Core Mining Congo SARL Coal 25000m < 450 m
24 IMFA & UCIL Chromite, Uranium, Coal 13365m < 250 m
25 SME Limited Coal 11403m < 700 m
26 Ballasore Alloys Limited Chromium and Iron 11736m < 120 m
27 Joy Prakash Limestone 6500m < 200 m
28 National Hydro Power Geotechnical Project 8200m < 200 m
29 National Hydro Power Geotechnical Project 22090.01m < 150 m
30 Ircon International Limited Geotechnical Project 3700m < 400 m
31 Adhunik Cement Limited Limestone 1440m < 150 m

Winders

SL No.WorkDate of CompletionType of ProjectInclusive of
1Shantikhani 600 KW AC Winders31-12-2019EPC ProjectHead Gear /Winder/ Electricals/ Motors/ Loading/Cage/Pulley etc
2IMFA Winder 450 KW AC Winders31-12-2019EPC ProjectHead Gear /Winder/ Electricals/Motors/ Loading& Unloading System /Skip/Cage/Pulley etc
3Kandri Shaft Deepening 250 KW AC Winders12-09-2018EPC ProjectHead Gear /Winder/Electricals/Motors/ Loading& Unloading System /Skip/Cage/Pulley etc
4Chikla Deepening of Shaft & Winder 464 KW05-10-2015EPC ProjectHead Gear /Winder/Electricals/Motors/ Loading& Unloading System /Skip/Cage/Pulley etc
5Balaghat Ventilation Shaft sinking & Winder 250 KW AC31-08-2019EPC ProjectHead Gear /Winder/Electricals/Motors/ Loading& Unloading System /Skip/Cage/Pulley etc
6Chikla Shaft sinking with Winder commission 300 KW AC28-02-2019EPC ProjectHead Gear /Winder/Electricals/Motors/ Loading& Unloading System /Skip/ Cage/Pulley etc
7HCL Kendadih 425 KW AC Winder16-04-2016EPC ProjectHead Gear /Winder/Electricals/Motors/ Loading& Unloading System/ Skip/Cage/Pulley etc
8MOIL Munsar – 185KW DC Winder30-11-2014EPC ProjectHead Gear /Winder/Electricals/Motors/ Loading& Unloading System /Skip/Cage/Pulley etc

Shaft Sinkings

Sr. No.Project NameOverviewClient
 400mtr and above Depth  
1Incline shaft with walling, roofing of open excavation at Kurja Mines650 M lengthSECL
2Sinking of a return air shaft at Adriyala Project6.5 Mtr dia & 584 Mtr. depthSCCL
3Designing, Sinking, Lining & Equipping of Vertical Shaft at Bagjata Mine5 Mtr dia & 425 M depth.UCIL
 300mtr to 400mtr Depth  
1Sinking, lining and equipping of shaft with supply, installation and commissioning of 550 KW winder at Ukwa Mine.5.5 Mtr dia & 374 Mtr depth.MOIL
2Sinking, lining and equipping of a Man winding shaft with supply, installation and commissioning of 450 KW winder at Mahagiri Mine (MMC) IMFA.4.5 Mtr dia and approximate 300 Mtr depth.IMFA
 200mtr to 300mtr Depth  
1Sinking of a return air shaft at JK Nagar, Pit No.26.5 Mtr dia & 280 Mtr. depthECL
2Sinking of Shaft at Amrit Nagar Coal Project, Pit No.36.5 Mtr dia & 273 Mtr. depthECL
3Sinking of Shaft at Sarpi Mine, Pit No.26.5 Mtr dia & 260 Mtr. depthECL
4Sinking of a return air shaft at GDK No. 9 Incline6.0 Mtr dia & 220 Mtr. depthSCCL
5Sinking of a Man winding shaft at GDK No. 10A Incline6.0 Mtr dia & 200 Mtr. depthSCCL
6Sinking of a return air shaft at GDK No. 10 Incline5.5 Mtr dia & 200 Mtr. depthSCCL
7Sinking, lining and equipping of shaft with allied works at Gumgaon Mine4.5 Mtr dia & 200 Mtr depthMOIL
8Deepening of Holmes shaft, equipping and construction of loading chamber with allied works at Balaghat Mine6.5 Mtr. x 5 Mtr. & 200 Mtr depthMOIL
9Excavation, Sinking & Lining of East Ventilation Shaft at Turamdih Mines.4.5 Mtr dia & 180 Mtr depthUCIL
 100mtr to 200mtr Depth  
1Sinking and Lining of shaft at Sheetaldhara project6.5 M dia & 165 M depthSECL
2Sinking and Lining of shaft at Sheetaldhara project6.0 M dia & 160 M depthSECL
3Sinking, lining and equipping of shaft with supply, installation and commissioning of 250 KW winder at Munsar Mine4.5 Mtr dia & 164 Mtr depthMOIL
4Sinking, lining and equipping of shaft with supply, installation and commissioning of 250 KW winder at Chikhla Mine4.5 Mtr dia & 160 Mtr depthMOIL
5Deepening of Production shaft, equipping and construction of loading chamber with allied works at Balaghat Mine4.5 Mtr dia & 150 Mtr. depthMOIL
6Sinking and lining of a shaft at Nawapara project of Bhatgaon area140 MtrSECL
7Sinking of a return air shaft at GDK No. 1 Incline4.5 Mtr dia & 140 Mtr. depthSCCL
8Deepening of vertical shaft and allied work at Chikla Mine4.5 Mtr dia & 120 Mtr depthMOIL
 100mtr to 200mtr Depth  
1Shaft deepening, Equipping, supply and Installation of ore handling system and allied excavation at Khetri Mine, RajasthanProduction Shaft- 5.5 Mtr. dia & 100M depth; Service shaft- 5.5 M & 100 Mtr depth; BGML ShaftHCL
2Sinking & Lining of Two numbers of Ventilation Shaft at Mohuldih Mines4.5 Mtr dia, 100 Mtr depthUCIL
3Sinking and lining of a ventilation shaft at Balaghat Mine4.5 M dia & 99 Mtr depthMOIL
4Deepening of vertical shaft and allied work at Kandri Mine4.2 Mtr dia & 60 Mtr depthMOIL
5Sinking and lining of a high-speed service winze at Munsar Mine4.5 M dia & 44 M depthMOIL
6Sinking and lining of a ventilation shaft at Mahagiri Mines (MMC)5 Mtr dia & 41 Mtr depthIMFA
 Drivage & Man winding Installations   
1Underground drivage at Padmavati Mine980 M lengthSECL
2Underground drivage at Kurja mine500 M lengthSECL
3Supply, Installation & commissioning of a 600 KW winder along with fabrication and erection of headgear and equipping of shaft at Shantikhani375 Mtr depthSCCL
4425 KW Man Winding Installations at Kendadih Mine500 Mtr LengthHCL
5Equipping of a Man winding shaft at Charcha Mine of Baikunthpur area325 Mtr. DepthSECL